In this article, we will walk you through the process of installing and starting your CNC milling machine. As an example, we will use the Wattsan 0609 mini.

Preparing for installation

Begin by placing the box containing the machine in the designated installation area. Ensure that there is at least 1.5 meters of clearance between the machine and the surrounding walls. A 220V power outlet should be within easy reach to connect the machine and its accessories, along with a grounding point for proper electrical safety.

To unpack the machine, you will need an 8 mm-head screwdriver. Follow these steps:

  1. Remove the bolts securing the lower part of the box using the screwdriver.
  2. Carefully lift and remove the box from around the machine.
Wattsan 0609 mini installation guide

Included equipment

The standard equipment package includes:

  • 4 support legs
  • Main controller
  • Controller connection cable
  • USB cable
  • Set of cutters
  • Euro plug adapter
  • Power cable
  • Spanner set
  • Collet set
  • Hold-down tool set
Wattsan 0609 mini installation guide

Step-by-step installation guide

Connecting the control unit

  1. Unpack the control unit and locate the plugs for the machine’s bed.
  2. Connect the plugs to the corresponding ports on the control unit, following the markings.
  3. Position the control unit next to the machine’s bed.

Installing the machine’s supports

  1. Lift one side of the machine.
  2. Install the first pair of support legs.
  3. Repeat the process for the other side.

Connecting the controller cable

  1. Open the lid of the control unit.
  2. Connect the main controller’s connection cable to the interface board inside the control unit.
  3. Securely connect the main controller to the controller cable.
Wattsan 0609 mini installation guide

Setting up the spindle cooling system

  1. Take two short silicone hoses.
  2. Connect the hoses to the barb fittings on the chiller.
  3. Insert the chiller’s cooling pipes into the silicone hoses.
  4. Use plastic hose clamps to secure all connections between the chiller pipes and the hoses.
Wattsan 0609 mini installation guide

Powering on the machine

  1. Open the lid of the control unit.
  2. Switch on the machine’s main automatic cutout.
  3. Press the emergency stop button to release it.
  4. Press the green button on the control unit to start the machine.
  5. Turn on the chiller.

Zeroing the spindle position

  1. Once the machine starts, take the main controller.
  2. Select “All Axes Home” and press OK.
  3. Ensure that the machine correctly completes the zeroing procedure using the end sensors.
  4. Verify that the control panel displays the home menu.
Wattsan 0609 mini installation guide

Installing the cutter

  1. Loosen the spindle nut using a spanner.
  2. Insert the cutter into the nut and collet.
  3. Screw the nut with the cutter onto the spindle and tighten it securely using the spanner.

Starting a control program

  1. Insert a USB drive containing the control program.
  2. Press “Run” and insert the USB drive into the USB port of the control unit.
  3. Select the “U-Disc File” menu option and press OK.
  4. Choose the required file and press OK.
  5. Verify the program parameters and confirm by pressing OK.
  6. Start the program on the machine.

Conclusion

Proper installation of the Wattsan 0609 Mini CNC router ensures smooth operation and optimal performance. Following these steps carefully will help you set up the machine correctly and avoid potential issues. Once installed, your CNC router is ready for precision milling and cutting tasks.