Real Manufacturing, Real Quality
Every Wattsan machine is built in our factory with full accountability
8
en
2-Chuck vs. 3-Chuck Pipe Cutting Machines
Springs and unloading device
A cushion of 40 mm between the guides and the helical rail gives quality products even after 10 years of machine operation.
All the machine wires inside of the machine bed, and goes to the back of the machine. Ensure during cutting, won’t damage the wires. Low and high voltage electricity are separated.
Boost your productivity with Wattsan Heavy duty
![]() |
![]() |
| Learn more | Learn more |
| Chuck diameter | |
| Max pipe weight | |
| Number of chucks | |
| Control system | |
| Type of pipes | |
| Support | |
| Max chuck rotation acceleration | |
| Min residual length (tail) | |
| Semi-automatic loading | |
| Semi-automatic unloading | |
| Full-automatic loading | |
| Bevel head | |
| Welding seam detection | |
We ensure the smooth running of Wattsan machines




If the machine is not in stock when you purchase it, you must first wait for the assembly process to be completed. It can take at least three weeks (and up to six months). The delivery time itself ranges from 0 days to a month.
We may deliver on various terms. The most popular ones are EXW, FOB, CIF, and DDP. You can have a machine delivered to your workplace, the destination port, or you can organise the delivery yourself by contacting logistics providers.
EXW is the most basic shipment type, FOB and CIF may be considered the golden mean, and DDP is the most convenient.
Contact